January to March update, 2009

Mar 31

Children’s Ministry Wing/Administration Floor:
Stoneridge Fellowship Church is now meeting in the Bedford Place Mall until the Children’s/Administration wing is completed. This facility will accommodate the entire church ministries until the major sanctuary phase 2 is ready. The temporary upstairs sanctuary will allow us to leave the Mall and be able to meet in our new facility scheduled to be ready by August 31st.2009.

Dome:
The dome was erected over the construction site. This system worked well and all outside wall panels were poured and are ready to be lifted into position. On March 8th the Dome will be dismantled and removed from the construction site by March 15th.

Kitchen:
The donated kitchen was removed and is now stored at the Hubbards church site.

Panels:
The panels are scheduled to be lifted into position on April 6th. The crane should be on site the last week of March.